roadworks · the local record

West Lothian roadworks

Every road opening logged in West Lothian since 2006, taken from the official Scottish Road Works Register. This is the whole county in one place: who digs the roads, where, how often, how long it takes, and how much of it was never planned.

Every figure comes from the public register. Street names are worked out from each site’s map location and checked against known roads.

159,958
entries
2006 to 2026
span
52
organisations

What the register holds

Not all of it is a hole in the road

The register is a record of activity, not just digging. Alongside physical excavations it logs reactive repairs, advance enquiries, permissions and street events. Here is the real split across all 159,958 entries.

Physical excavations79,773 (49.9%)
Enquiries & permissions29,604 (18.5%)
Reactive & emergency25,416 (15.9%)
Events & disruption19,903 (12.4%)
Restrictions & orders4,169 (2.6%)
Other1,093 (0.7%)

Who digs the roads

52 organisations, and a clear shift

The council does just over half the work. The rest is the utilities, and increasingly the telecoms companies laying fibre.

West Lothian Council84,887 (53.1%)
Telecoms & fibre38,541 (24.1%)
Water18,330 (11.5%)
Electricity9,012 (5.6%)
Gas7,247 (4.5%)
Other1,051 (0.7%)
Rail712 (0.4%)

Top organisations

1.West Lothian CouncilWest Lothian Council
84,887 (53.1%)
2.BTTelecoms & fibre
26,043 (16.3%)
3.Scottish WaterWater
18,330 (11.5%)
4.Virgin Media LimitedTelecoms & fibre
9,726 (6.1%)
5.SP Energy NetworksElectricity
8,725 (5.5%)
6.SGNGas
7,122 (4.5%)
7.Netomnia LimitedTelecoms & fibre
1,347 (0.8%)
8.Network RailRail
712 (0.4%)

The fibre years

The balance has tipped fast. Over the last two years telecoms account for 54.4% of all works and the council just 22.5%, as the fibre rollout digs its way across the county.

The same roads, again and again

One street, a dozen different diggers

Of 7,568 streets on the register, 1,642 have been opened by five or more different organisations, and 3,334 by three or more. Each body plans on its own, so the same road is reopened again and again.

1,642
streets
opened by 5+ different organisations
21.7% of 7,568 recorded streets
3,334
streets
opened by 3+ different organisations
44.1% of all recorded streets

Main arteries · works 2006 to 2026

StreetTownWorksOrgs
Almondvale CrescentLivingston58716
Knightsridge East RoadLivingston52116
Main StreetEast Calder59015
Jubilee AvenueDeans21815
Old Well PlaceBlackburn42314
Station RoadKirknewton35114
Simpson ParkwayLivingston32314
Preston RoadLinlithgow37813
Kirkfield ViewLivingston22813
Edinburgh RoadBathgate79412
Whitburn RoadBathgate73012
Fitzallan PlaceBathgate39412
East Main StreetUphall39112
Murieston TrailLivingston37312
Station RoadArmadale34912
Pumpherston RoadUphall Station34712
Howden East RoadLivingston28712
Almondvale CourtLivingston27712

The most-dug streets

Twenty years of work, road by road

The roads that have seen the most recorded activity since 2006. The old town main streets dominate, the arteries that carry both the traffic and the pipes and cables underneath.

#StreetTownWorks
1High StreetLinlithgow1,205
2West Main StreetWhitburn800
3East Main StreetBroxburn796
4Edinburgh RoadBathgate794
5West Main StreetBroxburn788
6Whitburn RoadBathgate730
7South StreetArmadale630
8East Main StreetWhitburn605
9Main StreetEast Calder590
10Almondvale CrescentLivingston587
11Glasgow RoadBathgate579
12Knightsridge East RoadLivingston521
13West Main StreetArmadale518
14Bathgate RoadBlackburn510
15Main StreetFauldhouse453
16Armadale RoadWhitburn441
17Old Well PlaceBlackburn423
18Main StreetStoneyburn394
19Fitzallan PlaceBathgate394
20East Main StreetUphall391
21Blackburn RoadBlackburn382
22South Bridge StreetBathgate379
23Preston RoadLinlithgow378
24East Main StreetArmadale375
25Cousland RoadLivingston374

Unplanned work

About one in six was never scheduled

25,416 entries (15.9%) are reactive: urgent, emergency, or fixing something that had already failed. It is a rough measure of how much disruption nobody could plan around.

25,416reactive works (15.9% of total)
Urgent11,982
Emergency4,527
Remedial Other4,275
Defective Apparatus4,494
Remedial Dangerous138

How long it takes

Quick on average, with a long tail

Most works are short. The median is 3 days and the average 13.2. But a long tail drags on: 3,063 ran for more than ninety days and 438 for more than a year, the longest close to four years.

3
days, typical
median
13.2
days, average
mean
3,063
ran over 90 days
long tail
438
over a year
very long tail
4,239road closures recorded across all works

Across the county

Where the work falls

Roughly where the works land, by town. Livingston and Bathgate carry the most, but every town in the county is well represented.

Livingston49,011
Bathgate21,621
Broxburn & Uphall13,433
Whitburn11,730
Linlithgow11,193
Armadale8,605
West Calder & Addiewell4,915
Blackburn4,124
Winchburgh3,329
Fauldhouse2,090

Approximate zones based on each works’ map reference, so a few near the boundaries fall in the wrong column. They show the shape, not an exact count.

Twenty years of volume

Activity climbed, then settled high

Recorded activity rose through the 2010s, peaked around 2016 and 2017, then settled at roughly six to eight thousand entries a year, with 2025 back near the top of that range.

2026 is a partial year. Source: SRWR Open Data.

Right now

Still digging

About 8,764 entries in the last twelve months, with 931 already booked in ahead.

8,764
in the last 12 months
931
booked ahead

Looking forward

Planning a smarter county

This is not only a record of the past. The real value is in what it points to. Across a whole county, the roadworks data is the clearest case for where better coordination and smarter use of technology could cut disruption and save public money.

Plan the county’s works as one system

Fifty-two organisations dig the same roads with no shared forward plan. Could data and AI build a single county-wide view that batches jobs, so a street is opened once a year rather than several times, and times works around schools, events and peak traffic? Dig once, and dig well.

Score every dig for cost and disruption

If every planned job carried a cost and disruption score, the works that matter most could be prioritised and the rest combined or coordinated. A cost and impact approach, rather than first come, first dug.

Predict and prevent the avoidable

25,416 works were reactive. Could better data on ageing pipes and cables flag failures before they happen, turning emergency digs into planned ones, and could clearer incentives design out the worst overruns?

Use the levers already in place

Scotland already has rules for coordinating works and penalties for overruns and poor reinstatement. The real question is whether they are being used to full effect across the county, and where better data would help them bite.

The bigger idea is to help a place like West Lothian use data and new technology for the practical things, planning, services and resources, while protecting the character of its towns that no dataset ever captures. A county that runs smarter without losing what makes it home.

Sources & method

Data provenance

Caveats & data notes

  • The register records activities, not only physical digs. It includes advance enquiries, permissions and street events, and notices that were later abandoned. The composition breakdown separates these.
  • Street names are derived from each works’ map location and checked against known roads. A small number may name a neighbouring street.
  • Geography is approximate, grouped by grid-reference zones, so works near town boundaries can fall in the wrong column.
  • Works are de-duplicated by activity, with the most recent record kept. Durations use recorded start and end dates.
  • Contains public sector information licensed under the Open Government Licence v3.0.

Every figure on this page traces to its official source. Share it as it stands.

Keep going

The monthly reading

Get the next one by email

One email a month: the national resilience score, what moved, and the newest analyses like this one, plus The Quarterly Record four times a year. Every figure traced to its official source.